在线亚洲无码,日韩精品人妻视频,久久国产区,国产成人亚洲综合另类麻豆

您好,歡迎來到山東共贏瑞建設(shè)工程有限公司網(wǎng)站!

服務(wù)熱線

13165112299

公司動態(tài) 當(dāng)前位置:首頁-新聞資訊-公司動態(tài)工地大門設(shè)置要求要注意什么?

工地大門設(shè)置要求要注意什么?

發(fā)布時間:2024-07-22 來源:http://m.szaq365.com.cn/

工地大門設(shè)置要求:

Requirements for setting up construction site gates:

1、地面安全防護(hù)棚架的搭設(shè)高度、立柱的布置間距滿足來往人員的通行要求。

1. The height of the ground safety protection shed and the spacing between the columns should meet the requirements for the passage of personnel.

2、施工材料的運輸盡可能安排夜間進(jìn)行。

2. The transportation of construction materials should be arranged at night as much as possible.

3、施工場地內(nèi)的便道按照廠區(qū)道路位置進(jìn)行布置,根據(jù)現(xiàn)場踏勘情況,對場地平整后,鋪設(shè)25厘米道渣,經(jīng)壓路機碾壓后作為施工便道使用。便道寬4米,便道兩側(cè)設(shè)置排水溝。

3. The access roads within the construction site are arranged according to the location of the factory roads. Based on the site survey, after leveling the site, 25cm of ballast is laid and used as construction access roads after being rolled by a road roller. The access road is 4 meters wide and drainage ditches are installed on both sides of the road.

4、設(shè)進(jìn)出大門和道路貫通。路口設(shè)置安全指示標(biāo)志,夜間設(shè)置照明設(shè)施和掛設(shè)紅燈,禁止外來車輛出入。

4. Set up entrance and exit gates and connect roads. Set up safety signs at intersections, set up lighting facilities and hang red lights at night, and prohibit foreign vehicles from entering and leaving.

5、在施工過程中,在施工便道上不得堆積材料和停放機械,24小時保持道路雙暢通。

5. During the construction process, materials and machinery must not be piled up or parked on the construction access road, and the road must be kept clear 24 hours a day.

9c0c82ad5f765cfaaeb0407b924a76a

6、施工期間有大量的土方運輸車輛,為提率,結(jié)合實際情況,在施工場地內(nèi)設(shè)立車輛調(diào)頭處。

6. During the construction period, there are a large number of earthwork transportation vehicles. In order to improve efficiency and based on the actual situation, a vehicle turning point is set up within the construction site.

7、因基坑開挖,有可能造成便道塌陷的,必須做好保護(hù)措施,并設(shè)置安全警示標(biāo)志。

7. Due to excavation of foundation pits, it is possible to cause collapse of access roads, and protective measures must be taken and safety warning signs must be set up.

8、在便道邊實施基坑開挖施工,必須設(shè)護(hù)欄圍護(hù),夜間開啟足夠的照明燈并設(shè)紅燈示警。

8. When excavating a foundation pit at the roadside, it is necessary to set up guardrails for protection, turn on sufficient lighting at night, and set up red lights for warning.

9、場內(nèi)翻斗車定人定車持證上崗,并定期檢查維修剎車、轉(zhuǎn)向系統(tǒng)等。

9. On site dump truck, personnel and vehicles must be designated and certified to work, and regular inspections and maintenance of brakes, steering systems, etc. must be carried out.

10、便道每天派人清掃,保證清潔、暢通。

10. Send people to clean the sidewalk every day to ensure cleanliness and smoothness.

11、場內(nèi)交通由專人負(fù)責(zé),如有違規(guī)現(xiàn)象,及時制止,必要時處以罰款。

11. The on-site traffic is managed by a dedicated person. If there are any violations, they will be stopped in a timely manner and fines will be imposed if necessary.

12、對施工用車發(fā)放通行證進(jìn)行管理,施工前組織駕駛員熟悉場地及行車路線。

12. Manage the issuance of permits for construction vehicles, and organize drivers to familiarize themselves with the site and driving routes before construction.

13、保證圍護(hù)周邊的環(huán)境衛(wèi)生,保證施工便道的平整,并經(jīng)常進(jìn)行養(yǎng)護(hù)以保證通行車輛安全。

13. Ensure the hygiene of the surrounding environment, ensure the smoothness of the construction access road, and regularly maintain it to ensure the safety of passing vehicles.

亚洲视频中文字幕| 久久精品中文字幕女同| 无码丰满熟妇精品一区二区三区| 久久精品无码一区二区av黄鳝| 国产精品美女在线| 成人资源在线观看| 久久久熟女| 蜜臀久久99精品久久久| 国产小黄片在线播放| 亚洲成人欧美日韩| 日韩1区2区3区| 精品人妻一区| 人人澡人人澡人人看添AV| 亚洲国产成人在线观看| 躁躁日日躁| 日韩欧美不卡在线| 日本人妻熟妇丰满成熟HD系列| 最新国产拍偷乱偷精品| 东京热不卡| 亚洲第一页乱| 久久精品亚洲国产av| 懂色一区二区三区久久久| 欧妇女乱妇女乱视频| 2022亚洲天堂| 精品久久黑丝高跟鞋| 日韩AV在线免费观看| 婷婷五月中文字幕| 亚洲一区二区三区不卡视频| 99精品国产一区二区| 欧美一区二区公司| 久久久久国色AV免费观看性色| 国产内射在线观看| 沦为色老头泄欲的雅婷| jk丝袜自慰| 激情骚妇一二三四区| 久久久精品三区| 国产线视频精品免费观看视频| 好爽…又高潮了毛片免费看| 99精品偷自拍| 国产亚洲情侣一区二区无| 亚洲人成影视|